The owner
Carries the project risk and the schedule, but has usually contracted out the logistics to parties he does not direct himself.
“My module is in Thailand and my foundation is in Antwerp. The rest is detail. Right?”
Book · in preparation
Project logistics in EPC projects, seen from all four parties who have to make it work together: the owner, the EPC contractor, the forwarder and the carrier. The EPC Logistics book puts that practice on paper.
Nobody loses money on logistics in an EPC project. Except when nobody knows who signs for what.
A large EPC project brings together four parties with different interests, different contracts and different risks. The owner wants his plant on its foundation on time. The EPC contractor wants to stay inside his lump sum. The forwarder wants an instruction he can actually execute. The carrier wants a vessel filled at a rate that holds. When those four work past each other, the project pays for it.
This book describes that world from the inside, from all four seats. Not general supply chain theory, but the practice of modules, semi-submersibles, load ports, customs and Incoterms, with the choices that have to be made and what they cost when made wrongly. The cases are anonymised and the legal framework is international, not Dutch or Belgian.
Four seats at the table
Each chapter looks at the same decision through the eyes of a different party. That is the structure of the book, and the reason it exists.
Carries the project risk and the schedule, but has usually contracted out the logistics to parties he does not direct himself.
“My module is in Thailand and my foundation is in Antwerp. The rest is detail. Right?”
Often works lump sum and engineers the shipping arrangements. Every euro too much in there never comes back.
“It was in the bid. Whether it can be executed, we find out on the first sailing.”
Translates a project schedule into bookings, documents and customs. Is the first to know when a plan does not add up.
“I can arrange anything. Just not yesterday, and not at this rate.”
Thinks in vessel space, stability and sailing schedules, not in construction sites. A part charter is a puzzle with someone else’s cargo.
“Your module fits. Your completion date does not.”
The subjects
The structure follows the life of a shipment: from the moment logistics is still an assumption in a bid, to the module standing on its foundation.
Why this book

The author
Interim logistics manager since April 2023, after more than 25 years in logistics, chartering, heavy-lift operations and warehousing. Led the logistics of a four-billion-euro EPC project with three EPC partners, 14 semi-submersible carriers and 15 heavy-lift carriers from the Middle East and Asia. That kind of experience sits underneath this book, anonymised and detached from the client.
Register
There is no publication date and no order page yet. Leave your details and you will be the first to hear.
Only name and email are required. The rest helps me estimate the print run.
Interested?
There is no publication date and no order page yet. Send a message and I will let you know as soon as the book is out.