Project logistics, explained

What I run into on EPC projects, written down so it is usable: the logistics execution plan, heavy lift transport and how the roles divide between owner, EPC contractor, forwarder and carrier.

Articles

Start here

Written from assignments where these choices actually had to be made.

From LinkedIn

This week’s post

A short observation from project logistics every Monday, newest first. The reactions are shown below.

Gert GeevePosted 2 November 2026 · Importance of Accurate Documentation
Hand-drawn flow diagram: supplier workshop, packing list, shipping documents, port and laydown, site installation, each linked to the same package tag PKG-0417. Caption: agree format and marking in the PO.
A 300-tonne module is hard to lose. The crate with its anchor bolts is not. On large EPC projects I treat documentation as cargo. If the packing list is wrong, the shipment is wrong, whatever arrives on the quay. My rule of thumb: one package, one number, from the supplier's workshop to the installation point. The same ID on the packing list, the marking, the shipping documents and the site receipt. When engineering, procurement and the forwarder each invent their own reference, you spend weeks reconciling spreadsheets instead of building. So agree the packing list format and marking standard in the purchase order, not after the first shipment lands. And make tracking visible to construction, because they are the ones waiting. Dull? Perhaps. Still cheaper than searching a laydown area with a torch. How do you keep one source of truth across suppliers and forwarders?
#ProjectLogistics#EPC#ProjectCargo#MaterialManagement
Reactions on LinkedIn

Reactions are loaded directly from LinkedIn. If that fails, use the button below.

In the pipeline

What is coming

Topics in the queue. Missing something, or want one of these in more depth? Let me know.

  • Voyage charter vs time charter for project cargoShipping & contracts
  • Incoterms in EPC contracts: where risk really changes handsShipping & contracts
  • Freight forwarder or EPC contractor: who does whatShipping & contracts
  • Route survey for heavy transport: what it must coverHeavy lift
  • The marine warranty surveyor explainedHeavy lift
  • Laydown area planning on a congested siteSite material management
  • Red Sea rerouting: what the Cape of Good Hope cost projectsShipping & contracts
  • Logistics in the FEED phase: why it starts thereEPC project logistics

Question?

Something not covered here?

Call or email. A short conversation usually beats an article.