Field notes on project logistics
Articles on EPC logistics, heavy lift, out-of-gauge transport and project shipping. Written by Gert Geeve, CSCP, interim project logistics manager for EPC contractors and owners in the Netherlands, Belgium and worldwide.
Cargo claims in project logistics: prevent the damage, then protect the paper trail
The best cargo claim is the one you never have to file. How to prevent damage on heavy lift and module moves, and what to do in the first hours when it happens anyway.
· Read article ↗Project organisationInterfaces between engineering, procurement, logistics and construction on EPC projects
EPC projects rarely fail inside engineering, procurement, logistics or construction. They fail at the interfaces between them. Make those handovers visible and give each one an owner, and you stop modules waiting on a quay for a drawing, a permit or a crane nobody ordered.
· Read article ↗An EPC or heavy-lift project coming up?
I help owners and EPC contractors with logistics strategy, shipping tenders and execution all the way to site. As interim manager or adviser.